LIVING LAB N°27

LL27

LIVING LAB N°27

Residential building in L'Ametlla del Valles, Spain

IDENTITY CARD

Building type:
Location:
Year of construction:
Number of occupants:
Energy consuption:
Products interested in:
Products confirmed:
Quantity:

Residential building
L'Ametlla del Valles, Spain
1980
3
-
Heliatek’s organic PV
Indresmat’s windows
Indresmat’s insulation foam

Indresmat’s windows
Indresmat’s insulation foam
-

MOTIVATION FOR PRODUCT TESTING

Assessment of (bio)Polyurethan frames for windows and (bio)Polyurethan insulation foam on indoor environmental quality, complimentary to the results measured within PM&VL6, PM&VL7 and PM&VL8.

Product description

Indresmat's windows: KLIMA-PUR is a new top class in energy-saving windows & doors made from Polyurethane (PUR). Similarly to wooden windows & doors, KLIMA-PUR integrates a high-performance material with a circular design.

Indresmat's insulation foam: is a new type of Polyurethane insulation foam with highly improved fire safety, increased durability, and superior weathering resistance to be used in indoor and outdoor applications.

LL27Banner

Building description

3-story building (130 m²) with a traditional ventilated facade, 4-pitch roof made of concrete tiles, 180 m² traditional facade, 3 wooden doors and aluminium windows.

 

Climate

The temperature generally ranges from 2°C to 29°C and rarely drops below -2°C or rises above 32°C.

Internal climate

The temperature generally ranges from 2°C to 29°C and rarely drops below -2°C or rises above 32°C.

Renovation plan


The renovation includes changing of windows and using the ventilation gap in the façade as container for installing (bio)Polyurethan injected foam as additional thermal insulation.

 LL27RenovationPlan
 
 

Monitoring Plan

Thermal comfort parameters:
IAQ study:
Acoustic study:
Post-occupancy evaluation:
Envelope performance:

Indoor air temperature, relative humudity
CO2, PM2.5, PM10, formaldehyde, TVOC
-
Basic “one-off questionnaire” on the user-satisfaction with the overall indoor environmental quality
Heat flux, surface and ambient temperature

Timeline

 

Actions

Baseline measurements were performed from August to November 2024
Renovation started in November 2024 when windows were changed, in January 2026 the insulation foam was injected
Monitoring after the renovation is ongoing since December 2024 (for windows) and February 2026 (for insulation foam).

Timeline27
LL27_photo1
LL27_photo2

Residential building before renovation, December 2023.

LL27_photo3
LL27_photo4

New windows installed in November 2024.

LL27_photo5
LL27_photo6

Monitoring units installed in March 2025.