LIVING LAB N°21
Indresmat Office building, Spain
IDENTITY CARD
Building type:
Location:
Year of construction:
Number of occupants:
Energy consuption:
Products interested in:
Products confirmed:
Quantity:
Office building
Barcelona, Spain
1973
15
Indresmat’s windows
Indresmat’s windows
-
MOTIVATION FOR PRODUCT TESTING
Assessment of windows with (bio)Polyurethane foamed frames on indoor environmental quality for working spaces, complimentary to the results measured within PM&VL6, PM&VL7 and PM&VL8.
Product description
KLIMA-PUR is a new top class in energy-saving windows & doors made from Polyurethane (PUR). Similarly to wooden windows & doors, KLIMA-PUR integrates a high-performance material with a circular design.

Building description
3-story building with a 500 m2 flat roof with asphalt fabric, 6000 m2 refractory bricks facade, 550 m2 concrete foundation, doors made of wood and 100 m2 single pane fixed plaster windows and 300 m2 single pane aluminium sliding windows.
Climate
The façade to be renovated is external exposed to sun and to rain. Climate conditions are the ones corresponding to Barcelona metropolitan area. In Barcelona, the summers are short, warm, humid, and mostly clear and the winters are long, cold, and partly cloudy. Over the course of the year, the temperature typically varies from 5 °C to 28 °C and is rarely below 1ºC or above 31ºC.
Internal climate
Internal building climate conditions correspond to the external ones corresponding to Barcelona.
Renovation plan
Windows in one floor of the building are being changed.

Monitoring Plan
Thermal comfort parameters:
IAQ study:
Acoustic study:
Lighting study:
Post-occupancy evaluation:
Indoor air temperature, relative humudity
CO2, PM2.5, PM10, formaldehyde, TVOC
Sound pressure level
Ambient light
Basic “one-off questionnaire” on the user-satisfaction with the overall indoor environmental quality
Timeline
Actions
Baseline measurements started in December 2023 and concluded in May 2025
Product installation started in May 2025 and concluded in July 2025
Monitoring after the renovation is ongoing since August 2025.


Office building in December 2023 before the renovation.


Window replacement works in July 2025.


Office building after renovation, July 2025.